Dai, H, Cao, G and Su, H (2006) Management and Construction of the Three Gorges Project. Journal of Construction Engineering and Management, 132(06), 615–9.

Dzeng, R (2006) Identifying a Design Management Package to Support Concurrent Design in Building Wafer Fabrication Facilities. Journal of Construction Engineering and Management, 132(06), 606–14.

Ezeldin, A S and Sharara, L M (2006) Neural Networks for Estimating the Productivity of Concreting Activities. Journal of Construction Engineering and Management, 132(06), 650–6.

Fang, D, Chen, Y and Wong, L (2006) Safety Climate in Construction Industry: A Case Study in Hong Kong. Journal of Construction Engineering and Management, 132(06), 573–84.

Hegab, M, Smith, G R and Salem, O M (2006) Soil Penetration Modeling in Microtunneling Projects. Journal of Construction Engineering and Management, 132(06), 598–605.

Huang, R and Sun, K (2006) Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects. Journal of Construction Engineering and Management, 132(06), 585–97.

  • Type: Journal Article
  • Keywords: Construction industry; Project management; Scheduling; Algorithms; Resource management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(585)
  • Abstract:
    Repetitive scheduling methods are more effective than traditional critical path methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit-based algorithm for the planning and scheduling of repetitive projects is developed. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The algorithm takes into consideration: (1) the logical relationship of activity groups in a repetitive project; (2) the usage of various resource crews in an activity group; (3) the maintaining of resource continuity; and (4) the time and cost for the routing of resource crews. A sample case study and a case study of a sewer system project are conducted to validate the algorithm, as well as to demonstrate its application. Results and findings are reported.

Khalafallah, A and El-Rayes, K (2006) Minimizing Construction-Related Hazards in Airport Expansion Projects. Journal of Construction Engineering and Management, 132(06), 562–72.

Lo, T Y, Fung, I W and Tung, K C (2006) Construction Delays in Hong Kong Civil Engineering Projects. Journal of Construction Engineering and Management, 132(06), 636–49.

Nassar, K M and Hegab, M Y (2006) Developing a Complexity Measure for Project Schedules. Journal of Construction Engineering and Management, 132(06), 554–61.

Yi, K and Langford, D (2006) Scheduling-Based Risk Estimation and Safety Planning for Construction Projects. Journal of Construction Engineering and Management, 132(06), 626–35.

Zhao, T and Fu, C C (2006) Infrastructure Development and Expansion under Uncertainty: A Risk-Preference-Based Lattice Approach. Journal of Construction Engineering and Management, 132(06), 620–5.